Good Vibrations
As advances in material technology and structural efficiency find reflection in structures that are lighter, more slender, and more daring architecturally, design teams must focus more...

Megaproject Management
By the dredging and landfill project manager for the Port of Los Angeles and Alan E. Alcorn, P.E., an associate vice president of Moffat and Nichol Engineers in Los Angeles. The Pier 400...

New Navigation Channel
Among the facilities needed to accommodate Pier 400 at the Port of Los Angeles (POLA) was a new navigation channel to handle the increased container and liquid bulk traffic that the port...

Twenty-First Century Terminal
The Port of Los Angeles is already the busiest container facility in the United States, and the eighth busiest in the world. In 2000 it handled some 112 million tons (102 million Mg) of...

Raising the Bar of BART
Although it was originally designed to withstand a strong earthquake, and did so admirably in 1989, the Bay Area Transit (BART) system was recently evaluated to determine its ability to...

Dynamic Response of Lattice Towers and Guyed Masts
Prepared by the Task Committee on the Dynamic Response of Lattice Towers of the Technical Committee on Special Structures and the Technical Administrative Committee on Metals of the Structural...

Gap Analysis for Durability of Fiber Reinforced Polymer Composite in Civil Infrastructure
Prepared by the Civil Engineering Research Foundation. This report provides the results of a study on what is known and not known about the use of...

International Journal of Geomechanics
The International Journal of Geomechanics (IJOG) focuses on geomechanics with emphasis on theoretical aspects, including computational and analytical methods and related validations. Applications of interdisciplinary...

A Sound Assembly
In downtown Salt Lake City, the new 1.5 million sq ft (140 000 m�) conference center for the Church of Jesus Christ of Latter-Day Saints (LDS) faced design issues that include height restrictions,...

Tunneling beneath Cairo
The second phase of the Greater Cairo Metro system in Egypt included many geotechnical challenges. Thirteen kilometers of the 19-km heavy rail line were constructed underground within...

The Shape of Things to Come
High-performance steel (HPS) offers improved toughness and durability for bridge construction. This article presents several innovative concepts for HPS structural systems�including I-girders...

Water In, Water Out
Moving water into and out of the Eastside Reservoir, which will be the largest body of freshwater in southern California, requires some of the largest pumping and water conveyance systems...

Moving Mountains
The earthmoving and rock-crushing operations at the Eastside Reservoir represented one of the largest such projects in the history of the United States. The earth and rock-fill dams required...

Experimental Approach
One of the best kept secrets during World War II, the K-25 facility in the Cumberland Mountains of East Tennessee prepared uranium for use in nuclear weapons. By 1987, the 13 million sq...

On the New Waterfront
The Hoboken South Waterfront along the Hudson River is being relandscaped to create parks and streets on new and existing deck structures in a joint project of the city of Hoboken, New...

Walled In (Available in Geo-Environmental Special Issue only)
For more than 50 years manufacturing plants adjacent to the northeast bank of a midwestern creek produced asbestos-reinforced construction materials. When manufacturing at the plants ceased...

Ethics: A Design Responsibility
The design/build method of project delivery, because it largely removes the client from the quality control and assurance process, can lend itself to unethical behavior on the part of...

Keeping It Together
A new framing system for precast concrete columns and beams will allow tall buildings to withstand large earthquakes without damage to the structural integrity of the building. By using...

Sum of the Parts
As with all of the bay bridges that serve as life lines to the San Francisco peninsula, the 32-year-old San Mateo Bridge needs strengthening to withstand a maximum credible earthquake...

Above Them All
The design for what would be the next world's tallest building relies on a 1,550 ft (472 m) high concrete core that will give occupants of the top floors of the building unimpeded...

 

 

 

 

Return to search